Mr. Mine Wiki
Tag: Visual edit
Line 1: Line 1:
 
[[File:Placeholder|right|300px]]
 
[[File:Placeholder|right|300px]]
The engine is the "main part" of the drilling rig. There are currently 9 coded engines.
+
The engine is the "main part" of the drilling rig. Instead of only adding raw digging power, the engine actually improves the entire digging machine; an engine adds a raw digging value and a multiplier, which is added as the final operation in the Watt calculation.
  +
  +
A level 4 engine, for instance, brings 10W to the table, the same as the previous level 3 engine. However, it increases the multiplier from x1.5 to x4, improving the overall value of the digging machine far beyond the level it had with a level 3 engine. For more information about the Watt calculations, please see [[Drill]].

Revision as of 14:38, 13 May 2014

The engine is the "main part" of the drilling rig. Instead of only adding raw digging power, the engine actually improves the entire digging machine; an engine adds a raw digging value and a multiplier, which is added as the final operation in the Watt calculation.

A level 4 engine, for instance, brings 10W to the table, the same as the previous level 3 engine. However, it increases the multiplier from x1.5 to x4, improving the overall value of the digging machine far beyond the level it had with a level 3 engine. For more information about the Watt calculations, please see Drill.