(Created page with "right|300px The enginge is the "main part" of the drilling rig. There are currently 9 coded engines. ==Current Engines==") |
No edit summary |
||
Line 1: | Line 1: | ||
[[File:Placeholder|right|300px]] |
[[File:Placeholder|right|300px]] |
||
− | The |
+ | The engine is the "main part" of the drilling rig. There are currently 9 coded engines. |
==Current Engines== |
==Current Engines== |
Revision as of 13:08, 19 December 2013
The engine is the "main part" of the drilling rig. There are currently 9 coded engines.